Interconnector

United States (US-NW-IPCO) – United States (US-NW-PACE) interconnection (planned)

United States

70th-largest interconnector in United States of 159 · top 53% worldwide (#372 of 704)

Status
proposed
Capacity
765 MW
Commissioned
2028
Length
1,609 km
Voltage
500 kV
Connects to
United States
Geometry
Schematic — node to node, not a surveyed route

Comparable interconnectors · United States · 159 ranked

All interconnectors in United States

Co-located infrastructure · within 25 km

On the interactive map

Open the interactive map →

Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. Distance for planned capacity is converted from miles into km. We assume that the reported 765 MW of renewable integration that the Gateway West transmission project facilitates equals the net transfer capacity of the project along all sections of the line. Section D3 of the project (see Pacificorp website) is assumed to be the last section of the line that is required to be completed to facilitate exchange between both balancing authorities h