Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Interconnector
United States (US-FLA-FPL) – United States (US-FLA-JEA) interconnection
69th-largest interconnector in United States of 159 · top 53% worldwide (#371 of 704)
- Status
- operating
- Capacity
- 766 MW
- Length
- 526 km
- Connects to
- United States
- Reverse capacity
- 121 MW
- Geometry
- Schematic — node to node, not a surveyed route
Comparable interconnectors · United States · 159 ranked
- #1United States (US-MIDW-MISO) – United States (US-MIDA-PJM) interconnection10.1 GW
- #67United States (US-SW-SRP) – United States (US-SW-TEPC) interconnection803 MW
- #68United States (US-MIDW-AECI) – United States (US-MIDW-MISO) interconnection796 MW
- #69United States (US-FLA-FPL) – United States (US-FLA-JEA) interconnection766 MW
- #70United States (US-NW-IPCO) – United States (US-NW-PACE) interconnection (planned)765 MW
- #71United States (US-FLA-FPC) – United States (US-FLA-TEC) interconnection758 MW
Co-located infrastructure · within 25 km
- United States (US-FLA-FMPP) – United States (US-FLA-JEA) interconnection0 m · Interconnector · 75 MW
- Cologix Jacksonville JAX11.2 km · Data Centre
- J D Kennedy power station5.9 km · Power Plant · 370 MW · gas
- Keystone Coal Terminal Jacksonville6.0 km · Export Terminal
- Eagle LNG Terminal11 km · LNG Terminal
- Eagle LNG Terminal11 km · LNG Terminal
- Cedar Bay Cogeneration Plant12 km · Power Plant · 292 MW · coal
- Flexential Jacksonville13 km · Data Centre
- Northside Generating Station15 km · Power Plant · 1.4 GW · coal
On the interactive map
Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. — No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.
SOURCE: Global Transmission Database v0.1 (CC BY 4.0)