Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Interconnector
United States (US-NW-IPCO) – United States (US-NW-NEVP) interconnection
121st-largest interconnector in United States of 159 · top 85% worldwide (#593 of 704)
- Status
- operating
- Capacity
- 254 MW
- Length
- 823 km
- Connects to
- United States
- Reverse capacity
- 185 MW
- Geometry
- Schematic — node to node, not a surveyed route
Comparable interconnectors · United States · 159 ranked
- #1United States (US-MIDW-MISO) – United States (US-MIDA-PJM) interconnection10.1 GW
- #119United States (US-NW-AVA) – United States (US-NW-IPCO) interconnection265 MW
- #120United States (US-CAR-DUK) – United States (US-TEN-TVA) interconnection256 MW
- #121United States (US-NW-IPCO) – United States (US-NW-NEVP) interconnection254 MW
- #122United States (US-NW-AVA) – United States (US-NW-PACW) interconnection246 MW
- #123United States (US-NW-CHPD) – United States (US-NW-PSEI) interconnection234 MW
Co-located infrastructure · within 25 km
- United States (US-NW-BPAT) – United States (US-NW-NEVP) interconnection0 m · Interconnector · 160 MW
- United States (US-CAL-LDWP) – United States (US-NW-NEVP) interconnection0 m · Interconnector · 1.4 GW
- United States (US-CAL-CISO) – United States (US-NW-NEVP) interconnection0 m · Interconnector · 1.4 GW
- Verizon North Las Vegas11 km · Data Centre
- Northwest Substation13 km · Substation / Converter
- 500 kV line13 km · Transmission Line
- Las Vegas generating station13 km · Power Plant · 359 MW · gas
- Flexential Las Vegas - Downtown13 km · Data Centre
- Las Vegas13 km · Data Centre
- Chuck Lenzie - Northwest 500KV14 km · Transmission Line
- Red Flats Solar18 km · Power Plant · 500 MW · solar
- Red Valley Solar18 km · Power Plant · 200 MW · solar
On the interactive map
Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. — No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.
SOURCE: Global Transmission Database v0.1 (CC BY 4.0)