Interconnector

United States (US-SW-AZPS) – United States (US-CAL-CISO) interconnection (planned)

United States

4th-largest interconnector in United States of 159 · top 13% worldwide (#89 of 704)

Status
proposed
Capacity
3,200 MW
Commissioned
2024
Length
201.2 km
Voltage
500 kV
Connects to
United States
Geometry
Schematic — node to node, not a surveyed route

Comparable interconnectors · United States · 159 ranked

All interconnectors in United States

Co-located infrastructure · within 25 km

On the interactive map

Open the interactive map →

Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. — Planned capacity relates to the Ten West Link project which is expected to be operationalized in 2024. The line runs between Arizona Public Service Company (USAAZ) and the territory of CAISO (USACI).

SOURCE: Global Transmission Database v0.1 (CC BY 4.0)