Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Power Plant
Xiangjiaba hydroelectric plant
9th-largest power plant in China of 11,537 · top 1% worldwide (#43 of 29,849)
- Operator
- China Yangzi River Three Gorges Group
- Owner
- Yanguang Life Insurance Shareholding CO LTD- Wanneng, China Yangzi River Three Gorges Group Co Ltd, Yunnan Province Energy Investment Group Co Ltd, publicly traded shares, China Nuclear Industry Group Co Ltd, China Securities and Finance Shareholding Co Ltd, Hong Kong Central Accounting Co Ltd, China Three Gorges Construction (Group) Co Ltd, Sichuan Province Energy Investment Group Co Ltd, Yangguang Life Insurance CO LTD- Jili, China Ping'an Life Insurance Shareholding Co Ltd
- Status
- operating
- Capacity
- 7,750 MW
- Fuel
- hydro
- Commissioned
- 2012
Comparable power plants · China · 11,537 ranked
- #1Motuo hydroelectric plant60.0 GW · hydro
- #7Qinghai Hainan Clean Energy Transmission Base solar farm9.6 GW · solar
- #8Xinjiang - Sichuan Power Export solar farms8.5 GW · solar
- #9Xiangjiaba hydroelectric plant7.8 GW · hydro
- #10Haixing nuclear power plant7.5 GW · nuclear
- #11Beilun power station7.1 GW · coal
Grid connection · within 50 km
- Nearest substation
- Fulong Converter
- Its voltage
- not recorded
- Distance
- 1.3 km
- Strongest line nearby
- 800 kV
- Substations in range
- 4
Mapped grid infrastructure from OpenStreetMap, whose coverage is excellent in some regions and sparse in others. Nothing shown here means nothing is mappednearby — not that the site is unconnected. Lines are matched on a segment’s midpoint, so a corridor passing directly overhead can be missed; this under-reports rather than invents.
Co-located infrastructure · within 25 km
- 500 kV line197 m · Transmission Line
- Fulong Converter1.3 km · Substation / Converter
- Yunnan Shuifu Yuntianhua Chemical Plant1.7 km · Chemical Plant
- Douba power station8.3 km · Power Plant · 300 MW · coal
- 复龙换流站11 km · Substation / Converter
- 800 kV line11 km · Transmission Line
- 800 kV HVDC line11 km · Transmission Line
- Huangjiaozhuang power station18 km · Power Plant · 400 MW · coal
- ±800千伏宜宾换流站21 km · Substation / Converter
On the interactive map
Portfolio
All assets by China Yangzi River Three Gorges Group →All assets by Yanguang Life Insurance Shareholding CO LTD- Wanneng →All assets by Yunnan Province Energy Investment Group Co Ltd →All assets by publicly traded shares →All assets by China Nuclear Industry Group Co Ltd →All assets by China Securities and Finance Shareholding Co Ltd →All assets by Hong Kong Central Accounting Co Ltd →All assets by China Three Gorges Construction (Group) Co Ltd →All assets by Sichuan Province Energy Investment Group Co Ltd →All assets by Yangguang Life Insurance CO LTD- Jili →All assets by China Ping'an Life Insurance Shareholding Co Ltd →
SOURCE: Global Energy Monitor · Global Integrated Power (CC BY 4.0)