Waddi wind farm

Australia

582nd-largest power plant in Australia of 615 · top 83% worldwide (#24,612 of 29,849)

Operator
Tilt Renewables
Owner
Tilt Renewables Pty Ltd
Status
construction
Capacity
108 MW
Fuel
wind
Commissioned
2034

Comparable power plants · Australia · 615 ranked

All power plants in Australia

Grid connection · within 50 km

Nearest substation
Yandin Terminal Substation
Its voltage
330 kV
Distance
21 km

Mapped grid infrastructure from OpenStreetMap, whose coverage is excellent in some regions and sparse in others. Nothing shown here means nothing is mappednearby — not that the site is unconnected. Lines are matched on a segment’s midpoint, so a corridor passing directly overhead can be missed; this under-reports rather than invents.