Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Power Plant
Tianjin Binhai Nangang (Guodian) Offshore solar farm
3917th-largest power plant in China of 11,537 · top 42% worldwide (#12,240 of 29,849)
- Operator
- Tianjin Guodian Power New Energy Development
- Owner
- GD POWER Development Co Ltd
- Status
- construction
- Capacity
- 300 MW
- Fuel
- solar
Comparable power plants · China · 11,537 ranked
- #1Motuo hydroelectric plant60.0 GW · hydro
- #3915Sichuan Kangding Green Mine solar farm300 MW · solar
- #3916Sichuan Ma'erkang Yinglang solar farm300 MW · solar
- #3917Tianjin Binhai Nangang (Guodian) Offshore solar farm300 MW · solar
- #3918Tianjin Binhai Nangang (Longyuan) Offshore solar farm300 MW · solar
- #3919Tianjin Binhai Tainpingzhen (CECEP) solar farm300 MW · solar
Grid connection · within 50 km
- Nearest substation
- 交流1000kV海河变电站
- Its voltage
- 1,000 kV
- Distance
- 40 km
- Strongest line nearby
- 1,000 kV
- Substations in range
- 1
Mapped grid infrastructure from OpenStreetMap, whose coverage is excellent in some regions and sparse in others. Nothing shown here means nothing is mappednearby — not that the site is unconnected. Lines are matched on a segment’s midpoint, so a corridor passing directly overhead can be missed; this under-reports rather than invents.
Co-located infrastructure · within 25 km
- Tianjin Binhai Nangang (Longyuan) Offshore solar farm0 m · Power Plant · 300 MW · solar
- Tianjin Nangang Industry District wind farm3.2 km · Power Plant · 335 MW · wind
- Tianjin Binhai Qinghe Nalan solar farm5.1 km · Power Plant · 120 MW · solar
- 500 kV line8.8 km · Transmission Line
- Tianjin Dechuan Petrochemical Plant9.0 km · Chemical Plant
- Caofeidian-Tianjin Oil Pipeline11 km · Pipeline
- Tianjin LNG Terminal (Sinopec)12 km · LNG Terminal · 6 Mtpa
- Tianjin LNG Terminal (Sinopec)12 km · LNG Terminal · 4.8 Mtpa
- Tianjin LNG Terminal (Sinopec)12 km · LNG Terminal · 0.85 Mtpa
- Nanjiang Port Area-Petrochemical Refinery Main Pipeline13 km · Pipeline
- Dagang-Petrochemical Refinery Main Pipeline13 km · Pipeline