Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Pipeline
Alcazar de San Juan-Yela Gas Pipeline — Main Line
- Operator
- Enagás
- Status
- operating
- Commissioned
- 2000
- Length
- 173.83 km
- Commodity
- gas
Co-located infrastructure · within 25 km
- Pioz RT1 solar farm9.1 km · Power Plant · 125 MW · solar
- 400 kV line10 km · Transmission Line
- Galatea solar farm11 km · Power Plant · 122 MW · solar
- Maladeta solar farm13 km · Power Plant · 163 MW · solar
- SET Anchuelo15 km · Substation / Converter
- SE Anchuelo15 km · Substation / Converter
- Centro de Datos Alcalá (Alcalá Data Center)22 km · Data Centre
- Subestación Loeches 123 km · Substation / Converter
On the interactive map
Portfolio
Spain → Spain
SOURCE: Global Energy Monitor · Global Gas & Oil/NGL Pipelines (GGIT / GOIT) (CC BY 4.0)