Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Pipeline
Saito Gas Pipeline
- Operator
- Tokyo Gas
- Status
- operating
- Commissioned
- 2015
- Length
- 36.62 km
- Commodity
- gas
Co-located infrastructure · within 25 km
- Shiroyama hydroelectric plant4.7 km · Power Plant · 250 MW · hydro
- Shiroyama hydroelectric plant4.7 km · Grid Storage · 250 MW
- 新野田線8.5 km · Transmission Line
- 500 kV line8.7 km · Transmission Line
- 新野田変電所8.7 km · Substation / Converter
- 新京葉線9.4 km · Transmission Line
- Saihoku Trunk Line15 km · Pipeline
- 新古河変電所18 km · Substation / Converter
- Northern Saitama Gas Pipeline20 km · Pipeline
- Chuo Trunk Line Gas Pipeline — Phase 1 and Phase 221 km · Pipeline
- 東京第6データセンター24 km · Data Centre
On the interactive map
Portfolio
Japan → Japan
SOURCE: Global Energy Monitor · Global Gas & Oil/NGL Pipelines (GGIT / GOIT) (CC BY 4.0)