Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Pipeline
Kisarazu Rinkai Gas Pipeline — 2
- Operator
- Tokyo Gas
- Status
- operating
- Commissioned
- 2015
- Length
- 17.57 km
- Commodity
- gas
Co-located infrastructure · within 25 km
- Kisarazu Rinkai Gas Pipeline — 11.5 km · Pipeline
- Nippon East Japan Works (Kimitsu) steel plant3.6 km · Iron & Steel Plant
- Kimitsu power station5.0 km · Power Plant · 1.2 GW · gas
- Sodegaura LNG6.5 km · LNG Terminal · 36 Mtpa
- Chiba-Sodegaura power station8.0 km · Power Plant · 1.9 GW · gas
- 富津火力線8.1 km · Transmission Line
- Futtsu thermal power station8.2 km · Power Plant · 5.3 GW · gas
- 富津火力線 / 富津線8.5 km · Transmission Line
- 新袖ヶ浦線9.1 km · Transmission Line
- Futtsu LNG Terminal9.3 km · LNG Terminal · 22.9 Mtpa
- Futtsu LNG10 km · LNG Terminal · 38 Mtpa
- 新木更津変電所11 km · Substation / Converter
On the interactive map
Portfolio
Japan → Japan
SOURCE: Global Energy Monitor · Global Gas & Oil/NGL Pipelines (GGIT / GOIT) (CC BY 4.0)