Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Pipeline
Bukhara-Tashkent-Bishkek-Almaty Gas Pipeline — Mubarek-Zirabulak III
- Operator
- Uztransgaz
- Status
- operating
- Length
- 130.61 km
- Commodity
- gas
Co-located infrastructure · within 25 km
- Mubarek-Kagan Gas Pipeline — II2.6 km · Pipeline
- Mubarek-Kagan Gas Pipeline — I2.9 km · Pipeline
- Bukhara-Tashkent-Bishkek-Almaty Gas Pipeline — Mubarek-Zirabulak I4.1 km · Pipeline
- Mubarek power station13 km · Power Plant · 216 MW · gas
Methane observations · within 25 km
- 4,426 kg/hr2023-08-14 · 11 km
- 3,104 kg/hr2023-08-26 · 12 km
- 3,081 kg/hr2023-08-26 · 12 km
- 2,688 kg/hr2023-08-22 · 12 km
- 2,360 kg/hr2023-06-07 · 12 km
Satellite detections from Global Energy Monitor’s Global Methane Emitters Tracker, each an instantaneous rate on the date shown — not an annual total, and not a current reading. GMET attributes a plume to a type of infrastructure, not to a named facility: these were observed near this asset, which is not evidence they came from it.
On the interactive map
Portfolio
Uzbekistan → Uzbekistan
SOURCE: Global Energy Monitor · Global Gas & Oil/NGL Pipelines (GGIT / GOIT) (CC BY 4.0)