Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Pipeline
Villapresente-Burgos Gas Pipeline
- Operator
- Enagás
- Status
- operating
- Commissioned
- 1988
- Length
- 130.22 km
- Commodity
- gas
Co-located infrastructure · within 25 km
- Mataporquera Cement Plant5.3 km · Cement Plant
- 400 kV line12 km · Transmission Line
- Sierra Del Escudo wind farm17 km · Power Plant · 101 MW · wind
- La Lora wind farm19 km · Power Plant · 100 MW · wind
- Aguayo II hydroelectric plant22 km · Power Plant · 1.0 GW · hydro
- Aguayo II hydroelectric plant22 km · Grid Storage · 1.0 GW
- Aguayo I hydroelectric plant22 km · Grid Storage · 360 MW
- Subestación de Aguayo24 km · Substation / Converter
- Subestación Eléctrica Virtus25 km · Substation / Converter
On the interactive map
Portfolio
Spain → Spain
SOURCE: Global Energy Monitor · Global Gas & Oil/NGL Pipelines (GGIT / GOIT) (CC BY 4.0)