Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Coal / Uranium Mine
Datong Jiangjiawan Coal Mine
1472nd-largest coal / uranium mine in China of 2,582 · top 55% worldwide (#2,706 of 4,963)
- Operator
- Datong Jiangjiawan Coal Mine
- Owner
- Datong Jiangjiawan Coal Mine
- Status
- operating
- Mineral
- coal
- Coal type
- thermal
- Output
- ~0.9 Mtpa
- Commissioned
- 1990
Comparable coal / uranium mines · China · 2,582 ranked
- #1Zhundong South Surface Mine
- #1470Ciyaota Coal Mine
- #1471Dafang Duijiangnan Coal Mine
- #1472Datong Jiangjiawan Coal Mine
- #1473Dongshan Dongxing Coal Mine
- #1474Dongshan Wulong Coal Mine
Co-located infrastructure · within 25 km
- Yungang Coal Mine1.3 km · Coal / Uranium Mine
- Shanxi Datong "Front Runner" Nanjiao Heguang solar farm3.0 km · Power Plant · 100 MW · solar
- Shanxi Datong "Front Runner" Nanjiao Liguang solar farm3.0 km · Power Plant · 100 MW · solar
- Shanxi Datong "Front Runner" Zhongdian solar farm3.0 km · Power Plant · 100 MW · solar
- Shanxi Zhangjiawan Coal Mine3.0 km · Coal / Uranium Mine
- Shanxi Gaoshan Coal Mine4.3 km · Coal / Uranium Mine
- 500 kV line9.1 km · Transmission Line
- Datong Jidong Cement Co Ltd Cement Plant17 km · Cement Plant
- Datong Qifengshan Cement Co. Cement Plant18 km · Cement Plant
- Shanxi Gas Pipeline Network — Jinshatan–Datong Pipeline20 km · Pipeline
- Datong Yunzhong Cement Co. Cement Plant21 km · Cement Plant
- Shanxi Tongde Xinghua Special Steel Co Ltd21 km · Iron & Steel Plant
Methane observations · within 25 km
- 3,084 kg/hr · coal mine2025-01-21 · 24 km
- 1,606 kg/hr · coal mine2025-03-31 · 19 km
- 1,505 kg/hr · coal mine2024-10-14 · 24 km
- 1,024 kg/hr · coal mine2025-02-10 · 21 km
- 870 kg/hr · coal mine2025-01-21 · 21 km
Satellite detections from Global Energy Monitor’s Global Methane Emitters Tracker, each an instantaneous rate on the date shown — not an annual total, and not a current reading. GMET attributes a plume to a type of infrastructure, not to a named facility: these were observed near this asset, which is not evidence they came from it.
On the interactive map
SOURCE: Global Energy Monitor · Global Coal Mine Tracker (GCMT) (CC BY 4.0)