Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
LNG Terminal
Alturas LNG Terminal
139th-largest lng terminal in United States of 162 · top 82% worldwide (#948 of 1,166)
- Owner
- Alturas LLC
- Status
- idle
- Capacity
- 1.5 Mtpa
- Commissioned
- 2016
- Retired
- 2018
- Direction
- export
- Commodity
- lng
Comparable lng terminals · United States · 162 ranked
- #1Sabine Pass LNG Terminal30.4 Mtpa
- #137Fourchon LNG Terminal2 Mtpa
- #138Penuelas LNG Terminal2 Mtpa
- #139Alturas LNG Terminal1.5 Mtpa
- #140Freeport LNG Terminal1.5 Mtpa
- #141Gibbstown Deepwater Port LNG Terminal1.5 Mtpa
Co-located infrastructure · within 25 km
- Motiva Enterprises Port Arthur Refinery power station1.1 km · Power Plant · 552 MW · gas
- Motiva Enterprises Port Arthur Refinery power station1.1 km · Power Plant · 258 MW · gas
- Port Arthur Refinery1.9 km · Refinery · 656 kb/d
- Motiva Enterprises Port Arthur Manufacturing Complex2.2 km · Chemical Plant
- Port Arthur LNG (under construction)2.9 km · LNG Terminal · 13.5 Mtpa
- Chevron Phillips Port Arthur Chemical Plant5.3 km · Chemical Plant
- Legend power station5.4 km · Power Plant · 754 MW · gas
- Port Arthur LNG Terminal8.4 km · LNG Terminal · 6.5 Mtpa
- Port Arthur LNG Terminal8.4 km · LNG Terminal · 6.5 Mtpa
- Indorama Ventures Port Neches Chemical Plant9.1 km · Chemical Plant
- Beaumont / Nederland9.3 km · Export Terminal
- Keystone Port Neches Link Oil Pipeline12 km · Pipeline
Methane observations · within 25 km
- 1,117 kg/hr · flarestack2021-04-28 · 24 km
- 1,055 kg/hr · LNG terminal2022-06-10 · 16 km
- 981 kg/hr · LNG terminal2022-06-13 · 16 km
- 640 kg/hr · LNG terminal2022-06-09 · 16 km
- 634 kg/hr · LNG terminal2022-06-14 · 15 km
Satellite detections from Global Energy Monitor’s Global Methane Emitters Tracker, each an instantaneous rate on the date shown — not an annual total, and not a current reading. GMET attributes a plume to a type of infrastructure, not to a named facility: these were observed near this asset, which is not evidence they came from it.
On the interactive map
Portfolio
SOURCE: Global Energy Monitor · Global Gas Infrastructure Tracker — LNG Terminals (GGIT) (CC BY 4.0)