Browse the atlas
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Kosovo — Energy Infrastructure
OverWatts maps 15 energy assets in Kosovo across 4 layers — the 139th-largest mapped base of 157 countries. They include 10 power plants, 3 interconnectors and 1 coal / uranium mines. Operating generation capacity is 1.4 GW, led by coal at 93%.
The companies named on the most assets are Korporata Energjetike e Kosovës JSC (5), Enlight Renewable Energy (1) and Kosovo Energy Corporation JSC (1), counting both ownership and operatorship. Half of Kosovo's mapped assets in service predate 1983 (median commissioning year of the 5 with a known date), 1 came online in the past decade and the oldest still listed is Hani i Elezit Cement Plant, dating from 1936. 6 projects are under construction or proposed, led by Ferizaj power plant (500 MW).
Operating generation capacity by fuel
Utility-scale sites of 100 MW and above. Distributed generation — rooftop solar especially — is outside the tracker, so this runs below national installed capacity.
- coal1.3 GW +190 MW planned
- wind103 MW +132 MW planned
- gas0 MW +500 MW planned
- solar0 MW +475 MW planned
Electricity generated by fuel · 2025
What the fleet actually produced — distinct from the installed capacity above.
- coal5.2 TWh 90%
- wind400 GWh 7%
- hydro200 GWh 3%
Ember · source · CC-BY-4.0
On the interactive map
Browse by asset class
Under construction & proposed
- Ferizaj power plantPower Plants · 500 MW · gas
- Gjakova solar farmPower Plants · 150 MW · solar · 2026
- Jasenovik Hybrid wind farmPower Plants · 132 MW · wind
- Solar4Kosovo solar farmPower Plants · 120 MW · solar
- Lindja solar farmPower Plants · 105 MW · solar
- Rahovec solar farmPower Plants · 100 MW · solar
Largest assets
- Kosovo B power stationPower Plants · 715 MW · coal · 1983
- Kosovo – Serbia interconnectionInterconnectors · 709 MW
- Kosovo – Macedonia interconnectionInterconnectors · 630 MW
- Kosovo A power stationPower Plants · 610 MW · coal · 1970
- Kosovo – Montenegro interconnectionInterconnectors · 553 MW
- Ferizaj power plantPower Plants · 500 MW · gas
- Kosovo A power stationPower Plants · 190 MW · coal · 1962
- Gjakova solar farmPower Plants · 150 MW · solar · 2026
- Jasenovik Hybrid wind farmPower Plants · 132 MW · wind
- Solar4Kosovo solar farmPower Plants · 120 MW · solar
- Lindja solar farmPower Plants · 105 MW · solar
- Bajgora wind farmPower Plants · 103 MW · wind · 2021
- Rahovec solar farmPower Plants · 100 MW · solar
- Sibovc Coal MineCoal & Uranium Mines · 2010
- Hani i Elezit Cement PlantCement Plants · 1936
Biggest owners & operators
- Korporata Energjetike e Kosovës JSC5 33%
- Enlight Renewable Energy1 7%
- Kosovo Energy Corporation JSC1 7%
- KOSTT1 7%
- Lindja Solar1 7%
- Sharrcem SHPK1 7%
- Solar Energy Group Europe (SEGE)1 7%
- StubllaEnergy1 7%
Counts an asset once per company named as its owner or operator; a joint venture counts for each partner.
Frequently asked
- How many energy assets does Kosovo have?
- OverWatts maps 15 in Kosovo across 4 asset classes — the 139th-largest mapped base of the 157 countries covered.
- How much electricity generation capacity does Kosovo have?
- About 1.4 GW operating across 3 plants, mostly coal 93% and wind 7%.
- Who owns Kosovo's energy infrastructure?
- Korporata Energjetike e Kosovës JSC is named as owner or operator on the most mapped assets (5), followed by Enlight Renewable Energy (1), Kosovo Energy Corporation JSC (1) and KOSTT (1).
- What energy projects are under construction in Kosovo?
- The largest under way or proposed are Ferizaj power plant (500 MW), Gjakova solar farm (150 MW) and Jasenovik Hybrid wind farm (132 MW).