Browse the atlas
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Uganda — Energy Infrastructure
OverWatts maps 29 energy assets in Uganda across 6 layers — the 113th-largest mapped base of 157 countries. They include 16 power plants, 7 cement plants and 2 oil & gas fields. Operating generation capacity is 1.4 GW, led by hydro at 100%. Refining capacity is about 60 kb/d.
The companies named on the most assets are Uganda Electricity Generation Company LTD (UEGCL) (6), Abu Dhabi Future Energy Co (2) and CNOOC Ltd (2), counting both ownership and operatorship. Half of Uganda's mapped assets in service predate 2015 (median commissioning year of the 11 with a known date), 5 came online in the past decade and the oldest still listed is Tororo Cement Plant, dating from 1952. 16 projects are under construction or proposed, led by Nakasongola nuclear power plant (7.2 GW).
Operating generation capacity by fuel
Utility-scale sites of 100 MW and above. Distributed generation — rooftop solar especially — is outside the tracker, so this runs below national installed capacity.
- hydro1.4 GW +1.6 GW planned
- nuclear0 MW +18.0 GW planned
- solar0 MW +400 MW planned
- wind0 MW +120 MW planned
Electricity generated by fuel · 2024
What the fleet actually produced — distinct from the installed capacity above.
- hydro5.0 TWh 85%
- biomass500 GWh 8%
- oil200 GWh 3%
- solar200 GWh 3%
Ember · source · CC-BY-4.0
On the interactive map
Browse by asset class
Under construction & proposed
- Nakasongola nuclear power plantPower Plants · 7.2 GW · nuclear
- Kiruhura nuclear power plantPower Plants · 4.8 GW · nuclear
- Lamwo nuclear power plantPower Plants · 4.0 GW · nuclear
- Buyende nuclear power plantPower Plants · 2.0 GW · nuclear · 2031
- Ayago hydroelectric plantPower Plants · 840 MW · hydro
- Kiba hydroelectric plantPower Plants · 400 MW · hydro
- Oriang hydroelectric plantPower Plants · 392 MW · hydro
- Kween solar farmPower Plants · 150 MW · solar
- Uganda (Masdar) solar farmPower Plants · 150 MW · solar
- Karamoja wind farmPower Plants · 120 MW · wind
- Kapeeka (EA Astrovolt) solar farmPower Plants · 100 MW · solar
- Kingfisher Oil Field (Uganda)Oil & Gas Fields · 2022
- Tilenga Oil Field (Uganda)Oil & Gas Fields · 2022
- Moroto Cement PlantCement Plants · 2025
- Buikwe Cement PlantCement Plants · 2025
- Kisoro-Kabale MineIron Ore Mines
Largest assets
- Nakasongola nuclear power plantPower Plants · 7.2 GW · nuclear
- Kiruhura nuclear power plantPower Plants · 4.8 GW · nuclear
- Lamwo nuclear power plantPower Plants · 4.0 GW · nuclear
- Buyende nuclear power plantPower Plants · 2.0 GW · nuclear · 2031
- Ayago hydroelectric plantPower Plants · 840 MW · hydro
- Karuma hydroelectric plantPower Plants · 600 MW · hydro · 2023
- Kiba hydroelectric plantPower Plants · 400 MW · hydro
- Oriang hydroelectric plantPower Plants · 392 MW · hydro
- Tororo Refinery (planned)Refineries · 60 kb/d
- Bujagali hydroelectric plantPower Plants · 250 MW · hydro · 2012
- Kiira hydroelectric plantPower Plants · 200 MW · hydro · 2003
- Isimba hydroelectric plantPower Plants · 183 MW · hydro · 2019
- Nalubaale hydroelectric plantPower Plants · 180 MW · hydro · 1954
- Kween solar farmPower Plants · 150 MW · solar
- Uganda (Masdar) solar farmPower Plants · 150 MW · solar
- Karamoja wind farmPower Plants · 120 MW · wind
- Kapeeka (EA Astrovolt) solar farmPower Plants · 100 MW · solar
- Kingfisher Oil Field (Uganda)Oil & Gas Fields · 2022
- Tilenga Oil Field (Uganda)Oil & Gas Fields · 2022
- Devki Group Tororo steel plantIron & Steel Plants · 2027
- Tembo Steels Iganga plantIron & Steel Plants · 2022
- Namataba Cement PlantCement Plants · 2015
- Tororo Cement PlantCement Plants · 1952
- Hima Tororo Cement PlantCement Plants · 2018
- Hima Cement PlantCement Plants · 1994
Biggest owners & operators
- Uganda Electricity Generation Company LTD (UEGCL)6 21%
- Abu Dhabi Future Energy Co2 7%
- CNOOC Ltd2 7%
- Devki Group2 7%
- Hima Cement Ltd2 7%
- Sarrai Group Ltd2 7%
- TotalEnergies SE2 7%
- Uganda National Oil Co2 7%
Counts an asset once per company named as its owner or operator; a joint venture counts for each partner.
Frequently asked
- How many energy assets does Uganda have?
- OverWatts maps 29 in Uganda across 6 asset classes — the 113th-largest mapped base of the 157 countries covered.
- How much electricity generation capacity does Uganda have?
- About 1.4 GW operating across 5 plants, mostly hydro 100%.
- Who owns Uganda's energy infrastructure?
- Uganda Electricity Generation Company LTD (UEGCL) is named as owner or operator on the most mapped assets (6), followed by Abu Dhabi Future Energy Co (2), CNOOC Ltd (2) and Devki Group (2).
- What energy projects are under construction in Uganda?
- The largest under way or proposed are Nakasongola nuclear power plant (7.2 GW), Kiruhura nuclear power plant (4.8 GW) and Lamwo nuclear power plant (4.0 GW).