Browse the atlas
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Senegal · electricity network
Senegal power grid
OverWatts maps 2,061 km of Senegal's electricity transmission network across 50 line segments and 0 substations, the 88th most-mapped grid of 153 countries. Its backbone is high voltage (220–379 kV), carrying 2,061 km — 100% of the mapped length, with the highest tagged voltage at 225 kV. That works out to 10.6 km per 1,000 km² of land — partial OpenStreetMap coverage, ahead of 39% of mapped countries. It is connected to 2 neighbouring grids by 500 MW of existing cross-border transfer capacity, with a further 2,400 MW planned.
OpenStreetMap coverage
This grades how completely OpenStreetMap has drawn Senegal's network — not how much network exists. Large, sparsely-populated countries score low for geographic reasons alone, and every kilometre here is mapped length, so the totals are a floor rather than an operator-reported figure. 4% of segments carry a real line name and 4% an operator tag.
Mapped line length by voltage
- 220–379 kV2,061 km 100%
50 segments · a segment is credited to the country containing its midpoint, so a border-crossing line counts once, on one side.
Cross-border links from Senegal
- Mali250 MW
- Mauritania250 MW
- Gambia800 MW · planned
- Guinea800 MW · planned
- Guinea-Bissau800 MW · planned
500 MW existing · 2.4 GW planned · capacities from the Global Transmission Database v0.1 (CC BY 4.0), existing as of 2023
On the interactive map
Load against the network
Where there is room to connect a new load depends on published hosting capacity, which most operators release only as their own map. OverWatts does not yet ingest those feeds, so these are the density measures the open data supports — generation and mapped demand against mapped network — not a headroom figure.
Operators tagged on Senegal's network
- OMVG Energy Project1 50%
- Senelec1 50%
Segment counts from OSM `operator` tags, merged across spellings. Present on 4% of segments — this ranks who is recorded, not market share.
How Senegal compares · mapped grid by country
- 1. People's Republic of China624,300 km
- 86. Cambodia2,080 km
- 87. Croatia2,078 km
- 88. Senegal2,061 km
- 89. Taiwan2,052 km
- 90. Afghanistan1,940 km
Frequently asked
- How big is Senegal's transmission network?
- OverWatts maps 2,061 km of transmission line in Senegal, across 50 segments, plus 0 substations. This is mapped length from OpenStreetMap, not an operator-reported total — where OSM is incomplete the figure is a floor, never a ceiling.
- What voltage is Senegal's grid?
- Most of the mapped network is high voltage (220–379 kV): 2,061 km of 2,061 km. The highest voltage tagged anywhere in the country is 225 kV.
- How complete is the grid map for Senegal?
- Partial — 10.6 km of mapped line per 1,000 km² of land, ahead of 39% of the 153 countries with any mapped grid. Coverage grades how completely OpenStreetMap has drawn the network, not how much network exists; large, sparsely-populated countries score low for geographic reasons alone.
- Who operates the grid in Senegal?
- OMVG Energy Project, Senelec are tagged as operators on mapped segments. Operator tags are present on 4% of Senegal's segments, so this ranks who is *recorded*, not market share.
- What interconnectors connect Senegal to its neighbours?
- 500 MW of cross-border transfer capacity to Mali, Mauritania, plus 2,400 MW planned. Capacities are from the Global Transmission Database (v1.0, 2023).
Elsewhere in Senegal
Network geometry: OpenStreetMap (ODbL) © OpenStreetMap contributors, ingested and measured by OverWatts · derived 2026-07-26. Counts every mapped line of 220 kV and above; the map layer draws the ≥380 kV backbone only, so it shows less than is measured here.