Browse the atlas
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Honduras — Energy Infrastructure
OverWatts maps 23 energy assets in Honduras across 4 layers — the 125th-largest mapped base of 157 countries. They include 15 power plants, 4 interconnectors and 3 cement plants. Operating generation capacity is 1.6 GW, led by oil at 39%.
The companies named on the most assets are Empresa Nacional de Energía Eléctrica (6), Argos Guyane SAS (2) and Cementos Argos SA (2), counting both ownership and operatorship. Half of Honduras's mapped assets in service predate 2011 (median commissioning year of the 12 with a known date), 4 came online in the past decade and the oldest still listed is Bijao Cement Plant, dating from 1958. 9 projects are under construction or proposed, led by Honduras – Nicaragua interconnection (planned) (300 MW).
Operating generation capacity by fuel
Utility-scale sites of 100 MW and above. Distributed generation — rooftop solar especially — is outside the tracker, so this runs below national installed capacity.
- oil621 MW
- hydro513 MW +830 MW planned
- gas180 MW
- solar140 MW +300 MW planned
- wind126 MW +118 MW planned
Electricity generated by fuel · 2024
What the fleet actually produced — distinct from the installed capacity above.
- oil5.5 TWh 44%
- hydro3.8 TWh 30%
- solar1.2 TWh 10%
- biomass800 GWh 6%
- wind800 GWh 6%
- other400 GWh 3%
- coal100 GWh 1%
Ember · source · CC-BY-4.0
On the interactive map
Browse by asset class
Under construction & proposed
- Honduras – Nicaragua interconnection (planned)Interconnectors · 300 MW
- Honduras – El Salvador interconnection (planned)Interconnectors · 300 MW
- Choloma (DanaSun Energy) solar farmPower Plants · 300 MW · solar
- Patuca 2B hydroelectric plantPower Plants · 270 MW · hydro · 2026
- Jicatuyo hydroelectric plantPower Plants · 210 MW · hydro
- El Tornillo hydroelectric plantPower Plants · 200 MW · hydro · 2026
- Patuca 2A hydroelectric plantPower Plants · 150 MW · hydro · 2026
- San Marcos (Total Eren) wind farmPower Plants · 118 MW · wind · 2026
- Puerto Cortés LNG TerminalLNG Terminals
Largest assets
- Honduras – Nicaragua interconnectionInterconnectors · 300 MW
- Honduras – El Salvador interconnectionInterconnectors · 300 MW
- Honduras – Nicaragua interconnection (planned)Interconnectors · 300 MW
- Honduras – El Salvador interconnection (planned)Interconnectors · 300 MW
- Choloma (DanaSun Energy) solar farmPower Plants · 300 MW · solar
- Francisco Morazan hydroelectric plantPower Plants · 300 MW · hydro · 1986
- Patuca 2B hydroelectric plantPower Plants · 270 MW · hydro · 2026
- Planta Pavana III power stationPower Plants · 267 MW · oil · 2004
- ENERSA power stationPower Plants · 249 MW · oil · 2005
- Jicatuyo hydroelectric plantPower Plants · 210 MW · hydro
- El Tornillo hydroelectric plantPower Plants · 200 MW · hydro · 2026
- Brassavola power stationPower Plants · 180 MW · gas · 2024
- Patuca 2A hydroelectric plantPower Plants · 150 MW · hydro · 2026
- Nacaome Photovoltaic Solar Power PlantPower Plants · 140 MW · solar · 2015
- Cerro De Hula wind farmPower Plants · 126 MW · wind · 2011
- San Marcos (Total Eren) wind farmPower Plants · 118 MW · wind · 2026
- Río Lindo hydroelectric plantPower Plants · 109 MW · hydro · 1971
- Bijao Power StationPower Plants · 105 MW · oil · 2017
- Patuca 3 hydroelectric plantPower Plants · 104 MW · hydro · 2018
- Puerto Cortés LNG TerminalLNG Terminals
- Piedra Azul Cement PlantCement Plants · 1975
- San Lorenzo Cement PlantCement Plants · 2017
- Bijao Cement PlantCement Plants · 1958
Biggest owners & operators
- Empresa Nacional de Energía Eléctrica6 26%
- Argos Guyane SAS2 9%
- Cementos Argos SA2 9%
- Bijao Electric Company SA de CV1 4%
- Cementos del Norte SA1 4%
- Cementos Progreso Holdings SL1 4%
- Comercializadora de Electricidad Centroamericana de Honduras SA de CV1 4%
- Compañía Hondureña de Energía Solar1 4%
Counts an asset once per company named as its owner or operator; a joint venture counts for each partner.
Frequently asked
- How many energy assets does Honduras have?
- OverWatts maps 23 in Honduras across 4 asset classes — the 125th-largest mapped base of the 157 countries covered.
- How much electricity generation capacity does Honduras have?
- About 1.6 GW operating across 9 plants, mostly oil 39%, hydro 32% and gas 11%.
- Who owns Honduras's energy infrastructure?
- Empresa Nacional de Energía Eléctrica is named as owner or operator on the most mapped assets (6), followed by Argos Guyane SAS (2), Cementos Argos SA (2) and Bijao Electric Company SA de CV (1).
- What energy projects are under construction in Honduras?
- The largest under way or proposed are Honduras – Nicaragua interconnection (planned) (300 MW), Honduras – El Salvador interconnection (planned) (300 MW) and Choloma (DanaSun Energy) solar farm (300 MW).