Browse the atlas
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Guatemala — Energy Infrastructure
OverWatts maps 27 energy assets in Guatemala across 7 layers — the 117th-largest mapped base of 157 countries. They include 9 power plants, 6 cement plants and 5 interconnectors. Operating generation capacity is 1.5 GW, led by biomass at 31%.
The companies named on the most assets are Cementos Progreso SA (3), Grupo Cemcal SA (3) and Empresa Petrolera Del Itsmo (2), counting both ownership and operatorship. Half of Guatemala's mapped assets in service predate 2003 (median commissioning year of the 16 with a known date), 6 came online in the past decade and the oldest still listed is San Miguel Cement Plant, dating from 1974. 3 projects are under construction or proposed, led by Guatemala – Honduras interconnection (planned) (300 MW).
Operating generation capacity by fuel
Utility-scale sites of 100 MW and above. Distributed generation — rooftop solar especially — is outside the tracker, so this runs below national installed capacity.
- biomass466 MW
- coal439 MW
- hydro417 MW
- oil160 MW
- solar0 MW +100 MW planned
Electricity generated by fuel · 2024
What the fleet actually produced — distinct from the installed capacity above.
- hydro6.3 TWh 40%
- biomass3.5 TWh 22%
- coal2.5 TWh 16%
- oil2.5 TWh 16%
- wind400 GWh 3%
- other300 GWh 2%
- solar300 GWh 2%
Ember · source · CC-BY-4.0
On the interactive map
Browse by asset class
Under construction & proposed
- Guatemala – Honduras interconnection (planned)Interconnectors · 300 MW
- Guatemala – El Salvador interconnection (planned)Interconnectors · 300 MW
- Santo Tomás solar farmPower Plants · 100 MW · solar · 2026
Largest assets
- Guatemala – Honduras interconnectionInterconnectors · 300 MW
- Guatemala – El Salvador interconnectionInterconnectors · 300 MW
- Guatemala – Honduras interconnection (planned)Interconnectors · 300 MW
- Guatemala – El Salvador interconnection (planned)Interconnectors · 300 MW
- Jaguar Energy power stationPower Plants · 300 MW · coal · 2016
- Pueblo Viejo hydroelectric plantPower Plants · 300 MW · hydro · 1983
- Magdalena Sugar Mill power stationPower Plants · 241 MW · biomass · 2004
- Guatemala – Mexico interconnectionInterconnectors · 200 MW
- Arizona power stationPower Plants · 160 MW · oil · 2003
- San José power stationPower Plants · 139 MW · coal · 2000
- Pantaleón power stationPower Plants · 121 MW · biomass · 1997
- Renace 2 Phase 1 hydroelectric plantPower Plants · 117 MW · hydro · 2016
- Santa Ana power stationPower Plants · 104 MW · biomass · 1984
- Santo Tomás solar farmPower Plants · 100 MW · solar · 2026
- Xan Oil Field (Guatemala)Oil & Gas Fields · 1990
- Atzam Oil Field (Guatemala)Oil & Gas Fields
- Rubelsanto Oil Field (Guatemala)Oil & Gas Fields
- Hydrocarbons Stationary Transport SystemPipelines · 1992
- Chinaja Oeste Oil Field (Guatemala)Oil & Gas Fields
- Port of Quetzal San José Coal TerminalExport Terminals
- AG Sidegua Masagua steel plantIron & Steel Plants · 1994
- Cemento Regional Esquintla PlantCement Plants · 2020
- Cemento Ultracem Esquintla PlantCement Plants · 2024
- La Pedrera Cement PlantCement Plants · 1901
- San Gabriel Cement PlantCement Plants · 2018
Biggest owners & operators
- Cementos Progreso SA3 11%
- Grupo Cemcal SA3 11%
- Empresa Petrolera Del Itsmo2 7%
- Perenco2 7%
- Cemento Holcim Guatemala SA1 4%
- Cemento Regional1 4%
- Compañía Agrícola Industrial Santa Ana SA1 4%
- Corporación AG SA1 4%
Counts an asset once per company named as its owner or operator; a joint venture counts for each partner.
Frequently asked
- How many energy assets does Guatemala have?
- OverWatts maps 27 in Guatemala across 7 asset classes — the 117th-largest mapped base of the 157 countries covered.
- How much electricity generation capacity does Guatemala have?
- About 1.5 GW operating across 8 plants, mostly biomass 31%, coal 30% and hydro 28%.
- Who owns Guatemala's energy infrastructure?
- Cementos Progreso SA is named as owner or operator on the most mapped assets (3), followed by Grupo Cemcal SA (3), Empresa Petrolera Del Itsmo (2) and Perenco (2).
- What energy projects are under construction in Guatemala?
- The largest under way or proposed are Guatemala – Honduras interconnection (planned) (300 MW), Guatemala – El Salvador interconnection (planned) (300 MW) and Santo Tomás solar farm (100 MW).