Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Colombia · electricity network
Colombia power grid
OverWatts maps 12,600 km of Colombia's electricity transmission network across 811 line segments and 23 substations, the 28th most-mapped grid of 153 countries. Its backbone is high voltage (220–379 kV), carrying 8,695 km — 69% of the mapped length, with the highest tagged voltage at 500 kV. That works out to 10.9 km per 1,000 km² of land — partial OpenStreetMap coverage, ahead of 39% of mapped countries. It is connected to 2 neighbouring grids by 743 MW of existing cross-border transfer capacity, with a further 1,900 MW planned.
OpenStreetMap coverage
This grades how completely OpenStreetMap has drawn Colombia's network — not how much network exists. Large, sparsely-populated countries score low for geographic reasons alone, and every kilometre here is mapped length, so the totals are a floor rather than an operator-reported figure. 8% of segments carry a real line name and 15% an operator tag.
Mapped line length by voltage
- 380–764 kV3,878 km 31%
- 220–379 kV8,695 km 69%
811 segments · a segment is credited to the country containing its midpoint, so a border-crossing line counts once, on one side.
Cross-border links from Colombia
743 MW existing · 1.9 GW planned · capacities from the Global Transmission Database v0.1 (CC BY 4.0), existing as of 2023
On the interactive map
Load against the network
Where there is room to connect a new load depends on published hosting capacity, which most operators release only as their own map. OverWatts does not yet ingest those feeds, so these are the density measures the open data supports — generation and mapped demand against mapped network — not a headroom figure.
Operators tagged on Colombia's network
- Interconexión Eléctrica S.A.69 56%
- ISA34 28%
- Energía de Bogotá4 3%
- Enertolima4 3%
- EPSA4 3%
- Isa intercolombia3 2%
- EEB2 2%
- Afinia1 1%
Segment counts from OSM `operator` tags, merged across spellings. Present on 15% of segments — this ranks who is recorded, not market share.
How Colombia compares · mapped grid by country
- 1. People's Republic of China624,300 km
- 26. Chile14,200 km
- 27. Thailand12,600 km
- 28. Colombia12,600 km
- 29. Peru11,800 km
- 30. Venezuela11,700 km
Frequently asked
- How big is Colombia's transmission network?
- OverWatts maps 12,600 km of transmission line in Colombia, across 811 segments, plus 23 substations. This is mapped length from OpenStreetMap, not an operator-reported total — where OSM is incomplete the figure is a floor, never a ceiling.
- What voltage is Colombia's grid?
- Most of the mapped network is high voltage (220–379 kV): 8,695 km of 12,600 km. The highest voltage tagged anywhere in the country is 500 kV.
- How complete is the grid map for Colombia?
- Partial — 10.9 km of mapped line per 1,000 km² of land, ahead of 39% of the 153 countries with any mapped grid. Coverage grades how completely OpenStreetMap has drawn the network, not how much network exists; large, sparsely-populated countries score low for geographic reasons alone.
- Who operates the grid in Colombia?
- Interconexión Eléctrica S.A., ISA, Energía de Bogotá and 5 others are tagged as operators on mapped segments. Operator tags are present on 15% of Colombia's segments, so this ranks who is *recorded*, not market share.
- What interconnectors connect Colombia to its neighbours?
- 743 MW of cross-border transfer capacity to Venezuela, Ecuador, plus 1,900 MW planned. Capacities are from the Global Transmission Database (v1.0, 2023).
Elsewhere in Colombia
Network geometry: OpenStreetMap (ODbL) © OpenStreetMap contributors, ingested and measured by OverWatts · derived 2026-07-26. Counts every mapped line of 220 kV and above; the map layer draws the ≥380 kV backbone only, so it shows less than is measured here.