Browse the atlas
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Republic of the Congo — Energy Infrastructure
OverWatts maps 34 energy assets in Republic of the Congo across 6 layers — the 109th-largest mapped base of 157 countries. They include 16 oil & gas fields, 6 power plants and 6 cement plants. Operating generation capacity is 604 MW, led by gas at 80%.
The companies named on the most assets are Société Nationale Des Pétroles Du Congo (16), Eni SpA (6) and Perenco SA (6), counting both ownership and operatorship. Half of Republic of the Congo's mapped assets in service predate 2014 (median commissioning year of the 18 with a known date), 6 came online in the past decade and the oldest still listed is Emeraude Marine Oil and Gas Field (Republic of the Congo), dating from 1972. 11 projects are under construction or proposed, led by Centrale Électrique du Congo (CEC) power station (516 MW).
Operating generation capacity by fuel
Utility-scale sites of 100 MW and above. Distributed generation — rooftop solar especially — is outside the tracker, so this runs below national installed capacity.
- gas484 MW +516 MW planned
- hydro120 MW +331 MW planned
- solar0 MW +100 MW planned
Electricity generated by fuel · 2024
What the fleet actually produced — distinct from the installed capacity above.
- gas4.0 TWh 74%
- hydro1.1 TWh 20%
- oil300 GWh 6%
Ember · source · CC-BY-4.0
On the interactive map
Browse by asset class
Under construction & proposed
- Centrale Électrique du Congo (CEC) power stationPower Plants · 516 MW · gas · 2027
- Mourala hydroelectric plantPower Plants · 230 MW · hydro
- Nyanga hydroelectric plantPower Plants · 101 MW · hydro
- Congo-Brazzaville solar farmPower Plants · 100 MW · solar
- Eni Congo FLNG II TerminalLNG Terminals · 2.4 Mtpa · 2025
- Litchendjili (Phase 3) Oil and Gas Field (Republic of the Congo)Oil & Gas Fields · 2020
- Minsala Marine Oil and Gas Field (Republic of the Congo)Oil & Gas Fields · 2022
- Nene Marine (Phase 3) Oil and Gas Field (Republic of the Congo)Oil & Gas Fields · 2020
- Niari Cement PlantCement Plants
- Sundance Resources Nabeba MineIron Ore Mines
- Zanaga Iron Ore Project MineIron Ore Mines
Largest assets
- Centrale Électrique du Congo (CEC) power stationPower Plants · 516 MW · gas · 2027
- Centrale Électrique du Congo (CEC) power stationPower Plants · 484 MW · gas · 2010
- Djeno TerminalExport Terminals
- Mourala hydroelectric plantPower Plants · 230 MW · hydro
- Moho-Bilondo Oil and Gas Field (Republic of the Congo)Oil & Gas Fields · 2008
- Imboulou hydroelectric plantPower Plants · 120 MW · hydro · 2011
- Nyanga hydroelectric plantPower Plants · 101 MW · hydro
- Congo-Brazzaville solar farmPower Plants · 100 MW · solar
- N'Kossa Marine Oil Field (Republic of the Congo)Oil & Gas Fields
- Moho (Phase 1bis - BILDM2,3) Oil and Gas Field (Republic of the Congo)Oil & Gas Fields · 2015
- Banga Kayo (Phase 1) Oil and Gas Field (Republic of the Congo)Oil & Gas Fields
- Likouala Marine Oil and Gas Field (Republic of the Congo)Oil & Gas Fields · 1980
- Nene Marine (Phase 2A) Oil and Gas Field (Republic of the Congo)Oil & Gas Fields · 2019
- Nene Marine (Phase 2B) Oil and Gas Field (Republic of the Congo)Oil & Gas Fields · 2014
- Tchibouela Marine Oil and Gas Field (Republic of the Congo)Oil & Gas Fields · 1987
- Emeraude Marine Oil and Gas Field (Republic of the Congo)Oil & Gas Fields · 1972
- M'Boundi Oil and Gas Field (Republic of the Congo)Oil & Gas Fields · 2002
- Yombo Marine Oil and Gas Field (Republic of the Congo)Oil & Gas Fields · 1991
- Boatou Oil and Gas Field (Republic of the Congo)Oil & Gas Fields · 2023
- Eni Congo FLNG II TerminalLNG Terminals · 2.4 Mtpa · 2025
- Congo FLNG TerminalLNG Terminals · 0.6 Mtpa · 2023
- Litanzi Oil and Gas Field (Republic of the Congo)Oil & Gas Fields
- Litchendjili (Phase 3) Oil and Gas Field (Republic of the Congo)Oil & Gas Fields · 2020
- Minsala Marine Oil and Gas Field (Republic of the Congo)Oil & Gas Fields · 2022
- Nene Marine (Phase 3) Oil and Gas Field (Republic of the Congo)Oil & Gas Fields · 2020
Biggest owners & operators
- Société Nationale Des Pétroles Du Congo16 47%
- Eni SpA6 18%
- Perenco SA6 18%
- LUKOIL PJSC5 15%
- Africa Oil & Gas Corp3 9%
- Petro Congo3 9%
- Trident Energy LP3 9%
- Congorep2 6%
Counts an asset once per company named as its owner or operator; a joint venture counts for each partner.
Frequently asked
- How many energy assets does Republic of the Congo have?
- OverWatts maps 34 in Republic of the Congo across 6 asset classes — the 109th-largest mapped base of the 157 countries covered.
- How much electricity generation capacity does Republic of the Congo have?
- About 604 MW operating across 2 plants, mostly gas 80% and hydro 20%.
- Who owns Republic of the Congo's energy infrastructure?
- Société Nationale Des Pétroles Du Congo is named as owner or operator on the most mapped assets (16), followed by Eni SpA (6), Perenco SA (6) and LUKOIL PJSC (5).
- What energy projects are under construction in Republic of the Congo?
- The largest under way or proposed are Centrale Électrique du Congo (CEC) power station (516 MW), Mourala hydroelectric plant (230 MW) and Nyanga hydroelectric plant (101 MW).