Data Centre

Colt FRA74

Operator
Colt Technology Services
Parent company
Fidelity Investments
Status
operating

Grid connection · within 50 km

Its voltage
380 kV
Distance
4.3 km
Strongest line nearby
380 kV
Line operator
TenneT TSO
Substations in range
16

Mapped grid infrastructure from OpenStreetMap, whose coverage is excellent in some regions and sparse in others. Nothing shown here means nothing is mappednearby — not that the site is unconnected. Lines are matched on a segment’s midpoint, so a corridor passing directly overhead can be missed; this under-reports rather than invents.