Substation / Converter

Shelby Substation

Operator
Tennessee Valley Authority
Status
operating
Voltage
500 kV

Grid connection · within 50 km

Nearest substation
Cordova Substation
Its voltage
500 kV
Distance
24 km
Strongest line nearby
500 kV
Substations in range
7

Mapped grid infrastructure from OpenStreetMap, whose coverage is excellent in some regions and sparse in others. Nothing shown here means nothing is mappednearby — not that the site is unconnected. Lines are matched on a segment’s midpoint, so a corridor passing directly overhead can be missed; this under-reports rather than invents.

Co-located infrastructure · within 25 km

On the interactive map

Open the interactive map →

Portfolio

SOURCE: OpenStreetMap (ODbL) © OpenStreetMap contributors