Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Transmission Line
500 kV line
- Voltage
- 500 kV
Co-located infrastructure · within 25 km
- 惠州变电站57 m · Substation / Converter
- 500 kV line67 m · Transmission Line
- Shenzhen Energy Fengda Gas Thermal power station6.8 km · Power Plant · 1.4 GW · gas
- Shenzhen Energy Fengda Gas Thermal power station6.8 km · Power Plant · 1.3 GW · gas
- Guangdong Huizhou power station11 km · Power Plant · 134 MW · biomass
- 崇文变电站20 km · Substation / Converter
- CNOOC Huizhou Branch Refinery21 km · Chemical Plant
- Huizhou Refinery22 km · Refinery · 440 kb/d
- 鲲鹏变电站22 km · Substation / Converter
- CNOOC Huizhou Petrochemical Plant23 km · Chemical Plant
- CNOOC and Shell Petrochemicals Huizhou Complex25 km · Chemical Plant