OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Transmission Line
Harry Allen - Crystal 500KV #1
- Operator
- Nevada Power Company
- Voltage
- 500 kV
Co-located infrastructure · within 25 km
- Harry Allen - Crystal 500KV #2724 m · Transmission Line
- Arrow Canyon Solar Hybrid2.2 km · Power Plant · 200 MW · solar
- 500 kV line4.0 km · Transmission Line
- Harry Allen power station4.1 km · Power Plant · 746 MW · gas
- Crystal Substation4.5 km · Substation / Converter
- Harry Allen Substation4.7 km · Substation / Converter
- Harry Allen - Apex 500KV4.8 km · Transmission Line
- Gemini Solar5.8 km · Power Plant · 690 MW · solar
- Chuck Lenzie Substation9.5 km · Substation / Converter
On the interactive map