Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Transmission Line
HVDC Gezhouba–Shanghai - electrode line
Co-located infrastructure · within 25 km
- 500 kV line2.9 km · Transmission Line
- Hubei Gas Pipeline Network — Yichang Zhongji Gas Pipeline8.5 km · Pipeline
- 500 kV HVDC line8.6 km · Transmission Line
- ±500kV葛洲坝换流站8.7 km · Substation / Converter
- Gezhouba hydroelectric plant9.9 km · Power Plant · 2.7 GW · hydro
- Huaxin Cement (Changyang) Co Ltd Cement Plant15 km · Cement Plant
- Yichang Fulong Iron and Steel Co Ltd16 km · Iron & Steel Plant
- Zhongxian-Wuhan Gas Pipeline16 km · Pipeline
- 宜都换流站18 km · Substation / Converter
- Yichang Zhongji Thermal power station18 km · Power Plant · 150 MW · gas
- Changyang Qingjiang hydroelectric plant20 km · Power Plant · 1.2 GW · hydro
- Changyang Qingjiang hydroelectric plant20 km · Grid Storage · 1.2 GW