Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Data Centre
Turkcell Kartal Veri Merkezi
- Operator
- Turkcell
- Status
- operating
Grid connection · within 50 km
- Nearest substation
- Kartal Gis TM
- Its voltage
- 400 kV
- Distance
- 2.8 km
- Strongest line nearby
- 380 kV
- Line operator
- TEİAŞ
- Substations in range
- 26
Mapped grid infrastructure from OpenStreetMap, whose coverage is excellent in some regions and sparse in others. Nothing shown here means nothing is mappednearby — not that the site is unconnected. Lines are matched on a segment’s midpoint, so a corridor passing directly overhead can be missed; this under-reports rather than invents.
Co-located infrastructure · within 25 km
- Kartal Gis TM2.8 km · Substation / Converter
- Maltepe İstanbul TM4.5 km · Substation / Converter
- Kaynarca Santrali5.6 km · Data Centre
- 380 kV line8.6 km · Transmission Line
- Adapazarı - Paşaköy TM EİH11 km · Transmission Line
- Paşaköy TM11 km · Substation / Converter
- Paşaköy TM EİH11 km · Transmission Line
- Star of Bosphorus Veri Merkezi16 km · Data Centre
- Kroman Steel Darica plant18 km · Iron & Steel Plant
- Aslan Darıca Cement Plant20 km · Cement Plant
- Turkcell Gebze Veri Merkezi21 km · Data Centre
- Georgia – Turkey interconnection25 km · Interconnector · 150 MW