Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Transmission Line
500 kV line
- Voltage
- 500 kV
Co-located infrastructure · within 25 km
- 500 kV line39 m · Transmission Line
- Бескудниково184 m · Substation / Converter
- Ногинск — Бескудниково1.8 km · Transmission Line
- Rostelecom Moscow-V1.9 km · Data Centre
- 3data A351.9 km · Data Centre
- IXcellerate North MOS 22.2 km · Data Centre
- CHP-21 (Mosenergo) power station6.0 km · Power Plant · 1.8 GW · gas
- CHP-21 (Mosenergo) power station6.0 km · Power Plant · 110 MW · gas
- CHP-27 (Mosenergo) power station6.8 km · Power Plant · 1.1 GW · gas
- Belarus – Russia - Central Federal District interconnection14 km · Interconnector · 2.7 GW
- Белый Раст — Западная17 km · Transmission Line
- Западная17 km · Substation / Converter