Substation / Converter

สถานีไฟฟ้าแรงสูงบ้านโป่ง 1

Operator
EGAT
Status
operating
Voltage
500 kV

Grid connection · within 50 km

Its voltage
500 kV
Distance
36 km
Strongest line nearby
500 kV
Line operator
การไฟฟ้าฝ่ายผลิตแห่งประเทศไทย
Substations in range
3

Mapped grid infrastructure from OpenStreetMap, whose coverage is excellent in some regions and sparse in others. Nothing shown here means nothing is mappednearby — not that the site is unconnected. Lines are matched on a segment’s midpoint, so a corridor passing directly overhead can be missed; this under-reports rather than invents.