Transmission Line

Adelanto - Intermountain (Path 27 HVDC)

Operator
Los Angeles Department of Water and Power
Voltage
500 kV HVDC

Co-located infrastructure · within 25 km

On the interactive map

Open the interactive map →

Portfolio