Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Transmission Line
500 kV line
- Voltage
- 500 kV
Co-located infrastructure · within 25 km
- UTE Central Termica La Tablada power station6.1 km · Power Plant · 200 MW · oil
- Montevideo Cement Plant8.0 km · Cement Plant
- 500 kV line10 km · Transmission Line
- Brazil (SO) – Uruguay interconnection13 km · Interconnector · 570 MW
- Argentina – Uruguay interconnection13 km · Interconnector · 3.9 GW
- Punta Sayago LNG (planned)14 km · LNG Terminal · 5 Mtpa
- Southern Cross Gas Pipeline — Main Line14 km · Pipeline
- GNL Del Plata FSRU15 km · LNG Terminal · 0.1 Mtpa
- Brujas 500kV19 km · Substation / Converter
- DataCenter de Google Uruguay23 km · Data Centre