Substation / Converter

Bland Substation

Operator
Ameren
Status
operating
Voltage
345 kV

Grid connection · within 50 km

Nearest substation
Loose Creek Substation
Its voltage
345 kV
Distance
35 km

Mapped grid infrastructure from OpenStreetMap, whose coverage is excellent in some regions and sparse in others. Nothing shown here means nothing is mappednearby — not that the site is unconnected. Lines are matched on a segment’s midpoint, so a corridor passing directly overhead can be missed; this under-reports rather than invents.

On the interactive map

Open the interactive map →

Portfolio

SOURCE: OpenStreetMap (ODbL) © OpenStreetMap contributors