Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Transmission Line
500 kV line
- Operator
- 国家电网
- Voltage
- 500 kV
Co-located infrastructure · within 25 km
- West-East Gas Pipeline 3 — Changsha branch4.6 km · Pipeline
- 1000 kV line5.0 km · Transmission Line
- 1000kV特高压潇湘变电站5.1 km · Substation / Converter
- 500 kV line5.2 km · Transmission Line
- 1000kV潇江I线;1000kV潇江II线7.2 km · Transmission Line
- 500kV望城变电站9.0 km · Substation / Converter
- Heimifeng hydroelectric plant16 km · Power Plant · 1.2 GW · hydro
- Heimifeng hydroelectric plant16 km · Grid Storage · 1.2 GW
- Hunan Changsha power station21 km · Power Plant · 100 MW · biomass
- Miluo Yuchi hydroelectric plant24 km · Power Plant · 1.2 GW · hydro
- Miluo Yuchi hydroelectric plant24 km · Grid Storage · 1.2 GW