Data Centre

Microsoft Newport data centre

Operator
Microsoft
Status
operating

Grid connection · within 50 km

Nearest substation
Imperial Park Substation
Its voltage
400 kV
Distance
742 m
Strongest line nearby
400 kV
Substations in range
13

Mapped grid infrastructure from OpenStreetMap, whose coverage is excellent in some regions and sparse in others. Nothing shown here means nothing is mappednearby — not that the site is unconnected. Lines are matched on a segment’s midpoint, so a corridor passing directly overhead can be missed; this under-reports rather than invents.

Co-located infrastructure · within 25 km

On the interactive map

Open the interactive map →

Portfolio

SOURCE: OpenStreetMap (ODbL) © OpenStreetMap contributors