Data Centre

Server Rasendriya (Nodeast Cloud)

Operator
PT Era Daya Cipta
Status
operating

Grid connection · within 50 km

Nearest substation
GITET Gandul
Its voltage
500 kV
Distance
9.2 km
Strongest line nearby
500 kV
Line operator
Perusahaan Listrik Negara
Substations in range
13

Mapped grid infrastructure from OpenStreetMap, whose coverage is excellent in some regions and sparse in others. Nothing shown here means nothing is mappednearby — not that the site is unconnected. Lines are matched on a segment’s midpoint, so a corridor passing directly overhead can be missed; this under-reports rather than invents.

Co-located infrastructure · within 25 km

On the interactive map

Open the interactive map →

Portfolio