Interconnector

United States (US-SW-TEPC) – United States (US-SW-WALC) interconnection

United States

116th-largest interconnector in United States of 159 · top 84% worldwide (#586 of 704)

Status
operating
Capacity
274 MW
Length
85 km
Connects to
United States
Reverse capacity
62 MW
Geometry
Schematic — node to node, not a surveyed route

Comparable interconnectors · United States · 159 ranked

All interconnectors in United States

Co-located infrastructure · within 25 km

On the interactive map

Open the interactive map →

Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. — Planned capacity relates to the Southline Transmission project. Construction is expected to start in 2025 with assumed year of operation being 2028.

SOURCE: Global Transmission Database v0.1 (CC BY 4.0)