Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Interconnector
United States (US-NW-PSEI) – United States (US-NW-TPWR) interconnection
152nd-largest interconnector in United States of 159 · top 97% worldwide (#678 of 704)
- Status
- operating
- Capacity
- 73 MW
- Length
- 39 km
- Connects to
- United States
- Reverse capacity
- 33 MW
- Geometry
- Schematic — node to node, not a surveyed route
Comparable interconnectors · United States · 159 ranked
- #1United States (US-MIDW-MISO) – United States (US-MIDA-PJM) interconnection10.1 GW
- #150United States (US-SW-AZPS) – United States (US-CAL-IID) interconnection73 MW
- #151United States (US-FLA-FPL) – United States (US-FLA-GVL) interconnection73 MW
- #152United States (US-NW-PSEI) – United States (US-NW-TPWR) interconnection73 MW
- #153United States (US-CAR-CPLE) – United States (US-CAR-YAD) interconnection69 MW
- #154United States (US-FLA-FPC) – United States (US-FLA-GVL) interconnection62 MW
Co-located infrastructure · within 25 km
- United States (US-NW-BPAT) – United States (US-NW-TPWR) interconnection0 m · Interconnector · 547 MW
- Tacoma Substation6.5 km · Substation / Converter
- 500 kV line6.6 km · Transmission Line
- Tacoma-Raver No 16.8 km · Transmission Line
- Centeris16 km · Data Centre
- Tacoma-Raver No 1;Tacoma-Covington No 217 km · Transmission Line
- Frederickson Power power station19 km · Power Plant · 318 MW · gas
- Frederickson power station19 km · Power Plant · 178 MW · gas
On the interactive map
Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. — No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.
SOURCE: Global Transmission Database v0.1 (CC BY 4.0)