Interconnector

United States (US-MIDW-MISO) – United States (US-CENT-SWPP) interconnection (planned)

United States

14th-largest interconnector in United States of 159 · top 21% worldwide (#143 of 704)

Status
proposed
Capacity
2,500 MW
Commissioned
2028
Length
1,029 km
Voltage
600 kV
Connects to
United States
Geometry
Schematic — node to node, not a surveyed route

Comparable interconnectors · United States · 159 ranked

All interconnectors in United States

Co-located infrastructure · within 25 km

On the interactive map

Open the interactive map →

Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. The Clean Line project's status is currently uncertain, and as a result its capacities have not been added (https://www.spglobal.com/marketintelligence/en/news-insights/research/as-ira-drives-renewables-investment-attention-turns-to-transmission-upgrades). — The Grain Belt Express Phase 1 line connects SPP to both MISO and AECI, and the Tiger Connector addition increases the total transmission to 2500 MW for Phase 1. Although SPP and MISO coll

SOURCE: Global Transmission Database v0.1 (CC BY 4.0)