Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Interconnector
United States (US-NW-IPCO) – United States (US-NW-PACW) interconnection
57th-largest interconnector in United States of 159 · top 47% worldwide (#324 of 704)
- Status
- operating
- Capacity
- 973 MW
- Length
- 542 km
- Connects to
- United States
- Reverse capacity
- 774 MW
- Geometry
- Schematic — node to node, not a surveyed route
Comparable interconnectors · United States · 159 ranked
- #1United States (US-MIDW-MISO) – United States (US-MIDA-PJM) interconnection10.1 GW
- #55United States (US-NW-IPCO) – United States (US-NW-PACW) interconnection (planned)1.0 GW
- #56United States (US-NW-PACE) – United States (US-NW-WACM) interconnection986 MW
- #57United States (US-NW-IPCO) – United States (US-NW-PACW) interconnection973 MW
- #58United States (US-SW-HGMA) – United States (US-SW-SRP) interconnection972 MW
- #59United States (US-NW-BPAT) – United States (US-NW-CHPD) interconnection956 MW
Co-located infrastructure · within 25 km
- United States (US-CAL-CISO) – United States (US-NW-PACW) interconnection0 m · Interconnector · 32 MW
- United States (US-NW-PGE) – United States (US-NW-PACW) interconnection0 m · Interconnector · 166 MW
- United States (US-NW-GCPD) – United States (US-NW-PACW) interconnection0 m · Interconnector · 219 MW
- Mira Loma Substation15 km · Substation / Converter
On the interactive map
Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. — Planned capacity relates to Boardman to Hemingway transmission project. Project is expected to enter service in 2026.
SOURCE: Global Transmission Database v0.1 (CC BY 4.0)