Interconnector

United States (US-SW-AZPS) – United States (US-SW-PNM) interconnection (planned)

United States

7th-largest interconnector in United States of 159 · top 15% worldwide (#99 of 704)

Status
proposed
Capacity
3,000 MW
Commissioned
2026
Length
885 km
Voltage
525 kV
Connects to
United States
Geometry
Schematic — node to node, not a surveyed route

Comparable interconnectors · United States · 159 ranked

All interconnectors in United States

Co-located infrastructure · within 25 km

On the interactive map

Open the interactive map →

Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. Distance for planned capacity is converted from miles into km. The Sunzia project is expected to become operational in 2025/2026. We've assumed the latter year. — This is related to the Sunzia transmission line.

SOURCE: Global Transmission Database v0.1 (CC BY 4.0)