Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Interconnector
United States (US-SW-AZPS) – United States (US-NW-PACE) interconnection
83rd-largest interconnector in United States of 159 · top 63% worldwide (#437 of 704)
- Status
- operating
- Capacity
- 581 MW
- Length
- 939 km
- Connects to
- United States
- Reverse capacity
- 394 MW
- Geometry
- Schematic — node to node, not a surveyed route
Comparable interconnectors · United States · 159 ranked
- #1United States (US-MIDW-MISO) – United States (US-MIDA-PJM) interconnection10.1 GW
- #81United States (US-MIDW-LGEE) – United States (US-TEN-TVA) interconnection598 MW
- #82United States (US-NW-BPAT) – United States (US-NW-DOPD) interconnection586 MW
- #83United States (US-SW-AZPS) – United States (US-NW-PACE) interconnection581 MW
- #84United States (US-SW-DEAA) – United States (US-SW-SRP) interconnection576 MW
- #85United States (US-NW-AVRN) – United States (US-NW-PACW) interconnection574 MW
Co-located infrastructure · within 25 km
- United States (US-NW-NWMT) – United States (US-NW-PACE) interconnection0 m · Interconnector · 303 MW
- United States (US-CAL-LDWP) – United States (US-NW-PACE) interconnection0 m · Interconnector · 465 MW
- United States (US-NW-NEVP) – United States (US-NW-PACE) interconnection0 m · Interconnector · 499 MW
- Gadsby power station1.0 km · Power Plant · 485 MW · gas
- Flexential Salt Lake City - Fair Park1.5 km · Data Centre
- SLC Oil Pipeline1.9 km · Pipeline
- Flexential Salt Lake City - Downtown3.1 km · Data Centre
- Salt Lake City4.0 km · Data Centre
- Salt Lake City Refinery5.8 km · Refinery · 70 kb/d
- Terminal substation6.7 km · Substation / Converter
- Mid-Valley Substation7.8 km · Substation / Converter
- 90th South Substation21 km · Substation / Converter
On the interactive map
Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. — No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.
SOURCE: Global Transmission Database v0.1 (CC BY 4.0)