Interconnector

Poland – Ukraine interconnection

Poland

2nd-largest interconnector in Poland of 3 · top 37% worldwide (#257 of 704)

Status
operating
Capacity
1,215 MW
Length
689 km
Connects to
Ukraine
Geometry
Schematic — node to node, not a surveyed route

Comparable interconnectors · Poland · 3 ranked

All interconnectors in Poland

Co-located infrastructure · within 25 km

On the interactive map

Open the interactive map →

Following the news report, existing capacity as of early 2023 is estimated to be roughly 1215 MW following the synchronization of Ukraine with the ENTSO-E service area. — New 400 kV line entered service in 2023. UKR synchronized with POL (ENTSOE) so further expansion can be expected but no concrete plans can be found as of yet.