Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Interconnector
Estonia – Latvia interconnection (planned)
3rd-largest interconnector in Estonia of 4 · top 45% worldwide (#313 of 704)
- Status
- proposed
- Capacity
- 1,000 MW
- Commissioned
- 2045
- Length
- 279 km
- Connects to
- Latvia
- Geometry
- Schematic — node to node, not a surveyed route
Comparable interconnectors · Estonia · 4 ranked
- #1Estonia – Latvia interconnection (planned)1.1 GW
- #2Estonia – Finland interconnection1.0 GW
- #3Estonia – Latvia interconnection (planned)1.0 GW
- #4Estonia – Finland interconnection (planned)700 MW
Co-located infrastructure · within 25 km
- Lithuania – Latvia interconnection0 m · Interconnector · 950 MW
- Estonia – Latvia interconnection (planned)0 m · Interconnector · 1.1 GW
- Riga FSRU1 m · LNG Terminal · 3.6 Mtpa
- Riga FSRU1 m · LNG Terminal
- Strek Terminal926 m · Export Terminal
- Port of Riga solar farm4.4 km · Power Plant · 100 MW · solar
- Bišuciems4.9 km · Substation / Converter
- Imanta5.4 km · Substation / Converter
- Riga-1 power station6.4 km · Power Plant · 158 MW · gas
- Rīgas TEC-16.4 km · Substation / Converter
- Riga-2 power station11 km · Power Plant · 881 MW · gas
- Riga Coal Terminal12 km · Export Terminal
On the interactive map
The EMBER dataset includes a column with expected 2040 capacities + projects in permitting, planning and under consideration. We assume that these capacities are commissioned by 2045.
SOURCE: Global Transmission Database v0.1 (CC BY 4.0)