Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Interconnector
Canada - Manitoba – Canada - Ontario interconnection
19th-largest interconnector in Canada of 22 · top 88% worldwide (#616 of 704)
- Status
- operating
- Capacity
- 200 MW
- Length
- 1,510 km
- Voltage
- 230 kV
- Connects to
- Canada
- Geometry
- Schematic — node to node, not a surveyed route
Comparable interconnectors · Canada · 22 ranked
- #1Canada - Newfoundland – Canada - Quebec interconnection5.2 GW
- #17Canada - Manitoba – Canada - Saskatchewan interconnection350 MW
- #18Canada - Alberta – United States (US-NW-NWMT) interconnection300 MW
- #19Canada - Manitoba – Canada - Ontario interconnection200 MW
- #20Canada - Alberta – Canada - Saskatchewan interconnection150 MW
- #21Canada - Saskatchewan – United States (US-CENT-SWPP) interconnection150 MW
Co-located infrastructure · within 25 km
- Telus4.2 km · Data Centre
- Edgeconnex Toronto7.9 km · Data Centre
- Rogers9.8 km · Data Centre
- Cherrywood to Claireville 500kV11 km · Transmission Line
- Portlands Energy Centre11 km · Power Plant · 550 MW · gas
- Parkway TS11 km · Substation / Converter
- 500 kV line11 km · Transmission Line
- Claireville TS20 km · Substation / Converter
- Toronto Pearson Airport cogeneration Complex20 km · Power Plant · 117 MW · gas
- Lakeview Generating Station24 km · Power Plant · 2.4 GW · coal
- Cherrywood TS24 km · Substation / Converter
On the interactive map
Additional link between Ontario and Manitoba is considered as part of Phase 3 of the 'Northwest Bulk Transmission Line' developments but 'The IESO does not anticipate a need for Phase 3 at this time.' so no expected new planned capacities in the short term.
SOURCE: Global Transmission Database v0.1 (CC BY 4.0)