Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Interconnector
Burkina Faso – Togo interconnection (planned)
2nd-largest interconnector in Burkina Faso of 4 · top 76% worldwide (#532 of 704)
- Status
- proposed
- Capacity
- 374 MW
- Length
- 756 km
- Voltage
- 330 kV
- Connects to
- Togo
- Geometry
- Schematic — node to node, not a surveyed route
Comparable interconnectors · Burkina Faso · 4 ranked
- #1Burkina Faso – Niger interconnection (planned)450 MW
- #2Burkina Faso – Togo interconnection (planned)374 MW
- #3Burkina Faso – Cote DIvoire interconnection113 MW
- #4Burkina Faso – Ghana interconnection100 MW
Co-located infrastructure · within 25 km
- Benin – Togo interconnection0 m · Interconnector · 345 MW
- Ghana – Togo interconnection0 m · Interconnector · 438 MW
- Ketu Cement Plant5.3 km · Cement Plant
- Lomé Cement Plant7.6 km · Cement Plant
- Lomé Contour power station9.2 km · Power Plant · 100 MW · gas
- Site de Tranformation éléctrique de la CEB18 km · Substation / Converter
On the interactive map
In reference to the West African Power Pool North Dorsal project (North Core). Planned Capacity was sourced from ADP source (pg 4).
SOURCE: Global Transmission Database v0.1 (CC BY 4.0)