Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Power Plant
Sol De Lila Photovoltaic Solar Project
181st-largest power plant in Chile of 282 · top 65% worldwide (#19,208 of 29,849)
- Operator
- Enel Chile
- Owner
- Enel Chile SA
- Status
- operating
- Capacity
- 163 MW
- Fuel
- solar
- Commissioned
- 2021
Comparable power plants · Chile · 282 ranked
- #1H2 Magallanes wind farm10.0 GW · wind
- #179Chimango solar farm165 MW · solar
- #180Parral solar farm165 MW · solar
- #181Sol De Lila Photovoltaic Solar Project163 MW · solar
- #182La Confluencia hydroelectric plant163 MW · hydro
- #183La Mocha solar farm160 MW · solar
Grid connection · within 50 km
- Nearest substation
- Subestación Seccionadora Lo Aguirre
- Its voltage
- 500 kV
- Distance
- 21 km
- Strongest line nearby
- 500 kV
- Line operator
- Transelec
- Substations in range
- 3
Mapped grid infrastructure from OpenStreetMap, whose coverage is excellent in some regions and sparse in others. Nothing shown here means nothing is mappednearby — not that the site is unconnected. Lines are matched on a segment’s midpoint, so a corridor passing directly overhead can be missed; this under-reports rather than invents.
Co-located infrastructure · within 25 km
- Domeyko Solar Park0 m · Power Plant · 205 MW · solar
- Santiago2.8 km · Data Centre
- Equinix Data Center - ST32.9 km · Data Centre
- Datacenter Conavicoop3.3 km · Data Centre
- Guiaquivilo Melado hydroelectric plant3.6 km · Power Plant · 316 MW · hydro
- Bolivia – Chile interconnection (planned)3.9 km · Interconnector · 150 MW
- Argentina – Chile interconnection3.9 km · Interconnector · 200 MW
- Argentina – Chile interconnection (planned)3.9 km · Interconnector · 2.1 GW
- Gran Teno solar farm5.1 km · Power Plant · 240 MW · solar
- Quilcura Cement Plant9.8 km · Cement Plant
- Puente Alto Cement Plant20 km · Cement Plant
- AZA Colina steel plant20 km · Iron & Steel Plant