Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Power Plant
Phenix nuclear power plant
137th-largest power plant in France of 173 · top 72% worldwide (#21,480 of 29,849)
- Operator
- Commissariat À L'Energie Atomique
- Owner
- Commissariat À L'Energie Atomique
- Status
- idle
- Capacity
- 142 MW
- Fuel
- nuclear
- Reactors
- 1
- Commissioned
- 1974
- Retired
- 2010
Comparable power plants · France · 173 ranked
- #1Gravelines nuclear power plant5.7 GW · nuclear
- #135Maregès hydroelectric plant146 MW · hydro
- #136Saint Estève hydroelectric plant146 MW · hydro
- #137Phenix nuclear power plant142 MW · nuclear
- #138Tavaux Works power station141 MW · gas
- #139Choqueuse-les-Bénards wind farm141 MW · wind
Grid connection · within 50 km
- Nearest substation
- Poste électrique de Tavel
- Its voltage
- 400 kV
- Distance
- 16 km
- Strongest line nearby
- 400 kV
- Line operator
- RTE
- Substations in range
- 4
Mapped grid infrastructure from OpenStreetMap, whose coverage is excellent in some regions and sparse in others. Nothing shown here means nothing is mappednearby — not that the site is unconnected. Lines are matched on a segment’s midpoint, so a corridor passing directly overhead can be missed; this under-reports rather than invents.
Co-located infrastructure · within 25 km
- Liaisons 400 kV n°4 et 5 Tavel - Tricastin-Le Poste3.2 km · Transmission Line
- Caderousse hydroelectric plant6.3 km · Power Plant · 156 MW · hydro
- Liaisons 400 kV n°1 et 2 Tavel - Tricastin-Le Poste12 km · Transmission Line
- Liaison 400 kV n°1 Coulange - Tavel;Liaison 400 kV n°3 Tavel - Tricastin-Le Poste13 km · Transmission Line
- Poste électrique de Tavel16 km · Substation / Converter
- Bollène hydroelectric plant17 km · Power Plant · 348 MW · hydro
- Poste électrique du Tricastin20 km · Substation / Converter
- Tricastin nuclear power plant20 km · Power Plant · 3.8 GW · nuclear
On the interactive map
SOURCE: Global Energy Monitor · Global Integrated Power (CC BY 4.0)