Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Power Plant
Richwood Solar and Storage solar farm
2090th-largest power plant in United States of 3,831 · top 48% worldwide (#14,251 of 29,849)
- Owner
- Samsung C&T Corp
- Status
- proposed
- Capacity
- 250 MW
- Fuel
- solar
- Commissioned
- 2026
Comparable power plants · United States · 3,831 ranked
- #1Fermi America Project Matador power station6.0 GW · gas
- #2088Portage Solar250 MW · solar
- #2089Prairie Oak Solar250 MW · solar
- #2090Richwood Solar and Storage solar farm250 MW · solar
- #2091Roaring Springs solar farm250 MW · solar
- #2092Rock House Solar250 MW · solar
Grid connection · within 50 km
- Nearest substation
- Marysville Substation
- Its voltage
- 765 kV
- Distance
- 8.7 km
- Strongest line nearby
- 765 kV
- Line operator
- American Electric Power
- Substations in range
- 10
Mapped grid infrastructure from OpenStreetMap, whose coverage is excellent in some regions and sparse in others. Nothing shown here means nothing is mappednearby — not that the site is unconnected. Lines are matched on a segment’s midpoint, so a corridor passing directly overhead can be missed; this under-reports rather than invents.
Co-located infrastructure · within 25 km
- Marysville Substation8.7 km · Substation / Converter
- Cadence Solar Project9.4 km · Power Plant · 240 MW · solar
- Flatlick Sub AEP to Marysville Sub AEP 765KV9.8 km · Transmission Line
- AEUG Union Solar16 km · Power Plant · 325 MW · solar
- Maliszewski Sub AEP to Marysville Sub AEP 765KV17 km · Transmission Line
- Marysville Sub AEP to Sorenson Sub AEP 765KV17 km · Transmission Line
- Columbia Gas Transmission — Marysville Connector Pipeline20 km · Pipeline
- Columbia Gas Transmission — Northern Loop Project20 km · Pipeline
- Tangy Substation23 km · Substation / Converter
On the interactive map