Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Power Plant
Nottingham Solar solar farm
3768th-largest power plant in United States of 3,831 · top 93% worldwide (#27,567 of 29,849)
- Status
- proposed
- Capacity
- 100 MW
- Fuel
- solar
- Commissioned
- 2026
Comparable power plants · United States · 3,831 ranked
- #1Fermi America Project Matador power station6.0 GW · gas
- #3766New Market (Ohio) solar farm100 MW · solar
- #3767North Star (D.E. Shaw) Solar Project100 MW · solar
- #3768Nottingham Solar solar farm100 MW · solar
- #3769Oak Trail Solar100 MW · solar
- #3770Obion County solar farm100 MW · solar
Grid connection · within 50 km
- Nearest substation
- Tidd Substation
- Its voltage
- 345 kV
- Distance
- 11 km
- Strongest line nearby
- 765 kV
- Line operator
- American Electric Power
- Substations in range
- 13
Mapped grid infrastructure from OpenStreetMap, whose coverage is excellent in some regions and sparse in others. Nothing shown here means nothing is mappednearby — not that the site is unconnected. Lines are matched on a segment’s midpoint, so a corridor passing directly overhead can be missed; this under-reports rather than invents.
Co-located infrastructure · within 25 km
- JSW Steel USA Ohio plant6.9 km · Iron & Steel Plant
- Tidd Substation11 km · Substation / Converter
- Cardinal Plant11 km · Power Plant · 1.9 GW · coal
- Wylie Ridge Substation14 km · Substation / Converter
- 500 kV line14 km · Transmission Line
- Brooke County - SWN Oil and Gas Asset (West Virginia, United States)14 km · Oil & Gas Field
- Jefferson County - Ascent Oil and Gas Asset (Ohio, United States)15 km · Oil & Gas Field
- Toronto Substation16 km · Substation / Converter
- Jefferson County - EAP Ohio Oil and Gas Asset (Ohio, United States)16 km · Oil & Gas Field
- Kammer Sub AEP to South Canton Sub AEP 765KV16 km · Transmission Line
- Warrenton River Terminal18 km · Export Terminal
- Sammis Plant20 km · Power Plant · 2.5 GW · coal
On the interactive map
SOURCE: Global Energy Monitor · Global Integrated Power (CC BY 4.0)