Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Pipeline
Troll Oil Pipeline
- Operator
- Petoro A.S, Equinor, A/S Norske Shell, Total E&P Norge AS, Norske ConocoPhillips AS
- Status
- operating
- Commissioned
- 1995
- Length
- 49.04 km
- Commodity
- crude
Co-located infrastructure · within 25 km
- Mongstad power station375 m · Power Plant · 294 MW · gas
- Mongstad Terminal406 m · Storage / Tank Farm
- Lindås trafostasjon1.9 km · Substation / Converter
- Northern Lights16 km · Carbon Capture (CCS)
- Grane Oil Pipeline20 km · Pipeline
- Sture Terminal22 km · Export Terminal
On the interactive map
Portfolio
Norway → Norway
SOURCE: Global Energy Monitor · Global Gas & Oil/NGL Pipelines (GGIT / GOIT) (CC BY 4.0)